Govt. Notification & Rules
Govt. approves VGF for development of BESS with capacity...
At least 85% of power from VGF-funded BESS projects to be first offered to Discoms
बोली में ऊर्जा भंडारण की लागत 10.18 रुपये प्रति किलोवाट...
बैटरी ऊर्जा भंडारण के लिए वीजीएफ और पीएलआई से भंडारण की लागत कम होने की उम्मीद: केंद्रीय ऊर्जा और नवीन एवं अक्षय ऊर्जा मंत्री
Union Power and New & Renewable Energy Minister
Cost of energy storage in bid increased to Rs 10.18 per kWh, VGF and PLI for battery energy storage expected to reduce storage cost
8 FAQs Around GST Annual Return-GSTR 9
The GST annual return (GSTR 9) is a statement of return required to be filed annually by each registered person (except few specified...
भारतीय सोलर पैनल निर्माताओं को राहत
सोलर सैल पर 25 प्रतिशत एवं मॉडयूल पर 40 प्रतिशत ड्यूटी लगाई गई
New Wage Code Bill 2021 -New Rules on Salary structure,...
The govt is planning to implement New Wage Code Bill 2021 from April 1. An announcement was made by Finance Minister during Budget...
Economic Survey 2020-21 : Press Conference by Chief Economic...
The Chief Economic Adviser (CEA), Dr Krishnamurthy V. Subramanian along with his team will address a Press Conference after the Economic...
Arrest Under GST: Caution Needs To Be Applied
ARREST न केवल किसी व्यक्ति के व्यवसाय को प्रभावित करता है, बल्कि यह व्यक्ति को मानसिक और शारीरिक रूप से बर्बाद कर देता है। गिरफ्तारी...